The PBCom Tower is an office skyscraper located in Makati, Metro Manila, Philippines. Standing at 259 meters (850 feet) tall with 52 storeys, it was completed in 2000 and held the title of the tallest building in the Philippines until 2017. The building serves as the headquarters of the Philippine Bank of Communications and is recognized as a major IT zone by the Philippine Economic Zone Authority (PEZA). (Wikipedia)

2. Alternate Names

  • Philippine Bank of Communications Tower
  • PBCom Tower Makati

3. Recognized Identities

Source Type Identity
Wikipedia PBCom Tower
Wikidata Q714470
DBpedia PBCom_Tower
ProductOntology N/A
Wiktionary skyscraper
Library of Congress Subject Headings (LCSH) Office buildings — Philippines — Makati
MeSH N/A
NCBI Taxonomy N/A
AGROVOC N/A
Google Scholar PBCom Tower Makati skyscraper tallest building PEZA IT zone
ConceptNet office building
OpenCyc N/A

4. Examples of Usage

  • Tallest Skyscraper Record: PBCom Tower was the tallest skyscraper in the Philippines for 17 years until it was surpassed by Federal Land’s Grand Hyatt Manila.
  • High-Rise Building (Philippines): The main canonical article details the architectural guidelines, zoning classifications, mechanical codes, and structural challenges.

5. Usage Scenarios

1. Leasing office space

A multinational IT outsourcing firm signs a lease agreement for two floors in the PBCom Tower to access PEZA tax incentives.

2. Installing telecommunications

A telecom carrier upgrades the fiber-optic riser system in the building to support high-frequency trading for financial tenants.

6. Strategies

  • Cross-reference architectural milestones and commercial zones with the main High-Rise Building (Philippines) article.
  • Utilize the building’s PEZA designation to secure fiscal and non-fiscal incentives for export-oriented businesses.

7. Security and Safety Measures

  • Maintain strict building access controls, utilizing card keys and metal detectors to monitor visitor traffic in the main lobby.
  • Schedule annual fire evacuation drills coordinates with the Makati Bureau of Fire Protection (BFP).

8. Historical Context

Designed by the architectural firm Skidmore, Owings & Merrill (SOM) in collaboration with local partner GF & Partners Architects, the PBCom Tower commenced construction in 1996 and was completed in 2000. The building utilized advanced structural engineering, including a hybrid concrete and steel frame, to ensure wind and seismic stability in the heart of the Makati Central Business District.

9. Challenges and Controversies

Traffic Congestion

Being located at the busy intersection of Ayala Avenue and Rufino Street, tenants face severe vehicular traffic congestion during rush hours.

Elevator Wait Times

During peak entry and exit hours, managing elevator passenger flow across high, mid, and low-zone levels requires computerized dispatch adjustments.